Roadwork Update
So far they've excavated a few rectangular blocks of pavement from the pink marked-off lanes. Then they replaced them and covered them with fresh black goo. The next day there were more pink lanes going almost the entire length of the street (it's not very long). I think a saw a machine that was slicing through the pavement along the lanes as I left one morning but I haven't seen any more signs of excavation. It's all very curious.
That is strange. I wonder if they are doing some work or inspections of the pipes and/or cabling under the street.
ReplyDeleteThere are some concrete pipes lying by the side of the street near my place so you're probably right.
ReplyDeleteThey've been working up the street the last few days and that part of the road is blocked off but it hasn't been affecting me.